Places

Campsites

Long Lead Bush Camp

0 Ratings

Features

Popular

  • Icon for Pets Allowed
    Pets Allowed
  • Icon for Free
    Free
  • Icon for Toilets
    Toilets
  • Icon for Allows fires
    Allows fires

Upgrade your camping experience



Location

,
Victoria

Map of Long Lead Bush Camp
Get directions

Details

Listing type
Campsite
Caravans
Yes

Average temperature

January
L 12°C
H 26°C
February
L 12°C
H 26°C
March
L 11°C
H 24°C
April
L 9°C
H 20°C
May
L 8°C
H 16°C
June
L 6°C
H 14°C
July
L 6°C
H 14°C
August
L 6°C
H 15°C
September
L 7°C
H 16°C
October
L 7°C
H 19°C
November
L 9°C
H 22°C
December
L 10°C
H 24°C
Source: Meteostat

Closest

Casterton Farm Supplies

18.45 km

Chargefox (standard)

45.18 km

Sherbrooke Estuary

259.44 km

Beach

160.82 km

Related lists

  • Camp with your pets at these 10 campgrounds near Coleraine, VIC

    We know it can be a struggle to find great campgrounds to go to with your pets that's why we collected this list of 10 campgrounds near Coleraine, VIC.

  • Top 10 campsites that allow fires near Langkoop, VIC

    They say life is better around the campfire. And we could not agree more.  Over the years due to increase fire risk it's become a challenge to find great campsites that allow you to have a fire by your tent.  Please be a responsible Aircamper and brush up on your fire safety knowledge. Bushwalking NSW has a great article that'll give you the rundown on how to light a fire responsibly. Below we've collected some hidden gems near Langkoop, VIC that still allow you to sit back, toast your feet and incinerate some marshmallows while telling stories about camping when you were a kid.

  • Top 10 campsites that allow fires near Monbulla, SA

    They say life is better around the campfire. And we could not agree more.  Over the years due to increase fire risk it's become a challenge to find great campsites that allow you to have a fire by your tent.  Please be a responsible Aircamper and brush up on your fire safety knowledge. Bushwalking NSW has a great article that'll give you the rundown on how to light a fire responsibly. Below we've collected some hidden gems near Monbulla, SA that still allow you to sit back, toast your feet and incinerate some marshmallows while telling stories about camping when you were a kid.

  • The top 10 coldest campsites in TAS for May

Nearby locations


Nearby campsites

Map attribution

© Mapbox © OpenStreetMap contributors