Places

Campsites

Long Lead Bush Camp

0 Ratings

Features

Popular

  • Icon for Pets Allowed
    Pets Allowed
  • Icon for Free
    Free
  • Icon for Toilets
    Toilets
  • Icon for Allows fires
    Allows fires

Upgrade your camping experience



Location

,
Victoria

Map of Long Lead Bush Camp
Get directions

Details

Listing type
Campsite
Caravans
Yes

Average temperature

January
L 12°C
H 26°C
February
L 12°C
H 26°C
March
L 11°C
H 24°C
April
L 9°C
H 20°C
May
L 8°C
H 16°C
June
L 6°C
H 14°C
July
L 6°C
H 14°C
August
L 6°C
H 15°C
September
L 7°C
H 16°C
October
L 7°C
H 19°C
November
L 9°C
H 22°C
December
L 10°C
H 24°C
Source: Meteostat

Closest

Casterton Farm Supplies

18.45 km

Chargefox (standard)

45.18 km

Sherbrooke Estuary

259.44 km

Beach

160.82 km

Related lists

  • Top 10 campsites that allow fires near Wando Vale, VIC

    They say life is better around the campfire. And we could not agree more.  Over the years due to increase fire risk it's become a challenge to find great campsites that allow you to have a fire by your tent.  Please be a responsible Aircamper and brush up on your fire safety knowledge. Bushwalking NSW has a great article that'll give you the rundown on how to light a fire responsibly. Below we've collected some hidden gems near Wando Vale, VIC that still allow you to sit back, toast your feet and incinerate some marshmallows while telling stories about camping when you were a kid.

  • Top 10 free campsites near Digby, VIC

    For those camping on the cheap, here are some great campsites we found near Digby, VIC. 

  • Top 10 free campsites near Wando Vale, VIC

    For those camping on the cheap, here are some great campsites we found near Wando Vale, VIC. 

  • The top 10 coldest campsites in NSW for January

Nearby locations


Nearby campsites

Map attribution

© Mapbox © OpenStreetMap contributors